Highway Frontage Doesn’t Promise a Driveway: What to Check Before You Buy or Sell Land on a Texas Highway

Rex Blackburn

Rex Blackburn, Commercial Director | Partner
October 25, 2026

Highway Frontage Doesn’t Promise a Driveway: What to Check Before You Buy or Sell Land on a Texas Highway

The short answer

Owning land along a state road gives you a front edge on that road. It doesn’t decide where your driveway goes. Across our area, that covers a lot of roads: I-35 and its frontage roads, Loop 1604, US 281, US 87, Highway 46, Highway 123 and the farm-to-market roads that run out into the Hill Country. On every one of them, TxDOT approves each new driveway and each change to an old one. It also decides how far apart driveways sit and which turns drivers can make.

So before you buy roadside land for a business, find out whether you can get the entrance you need. If you’re selling, ask every buyer what their plan needs from the road.

We’ve watched access make and break deals across our market area. The same piece of land can be wrong for one buyer and right for the next, and the driveway is often the reason.

What three of our sales taught us

A store that needed new driveways, and a contractor who didn’t. We sold 10 acres on US 281 in Spring Branch for two brothers. A convenience store company signed a cash contract at $1,600,000, then asked for more time from October 2025 to April 2026 while its driveway questions with TxDOT stayed open. As far as we know, TxDOT never turned them down. The answer just never came. A construction company owner was waiting as the backup buyer. The entrance already on 281 worked for his business, and his contract closed four days after it moved up. Read that story.

Diagram of one property on a divided highway. A contractor's yard uses the existing gate; a convenience store plan needs two new driveways that TxDOT must approve.

A tract that sold once the road work was done. On Highway 46 in Bulverde, TxDOT spent several years widening the road right past a 4.99-acre commercial tract we were selling. Buyers were looking at a construction zone. When the work wrapped up, a buyer who had seen the land before came back for a second look. The new turn lane in front lets cars enter and leave from both directions, and he saw that as a major advantage. It sold for $1,195,000. Read that story.

A family’s 95 acres, split along the entrances it already had. Off Ammann Road in Bulverde, the land had two entrances: one serving most of the property back to Cibolo Creek, and one to a small rent house. We sold the front 10 acres, with the rent house, to the county’s emergency services district and the other 85 acres to a family. Because each piece kept its own entrance, neither needed an easement across the other. Read that story.

Diagram of a family's 95 acres off Ammann Road in Bulverde split into 10 acres for the county's emergency services district and 85 acres for a family, each with its own entrance.

In each sale, what the road allowed shaped who bought, when they bought and how the land was divided.

The road decides who you call

Start by finding out what kind of road your land is on, because that tells you who approves a driveway.

State roads. Interstates, US highways, state highways, loops and farm-to-market roads are all part of the state system. TxDOT handles those. If your land is in Bexar, Comal, Guadalupe or Kendall County, the office is TxDOT’s San Antonio District. In Hays, Blanco or Gillespie County, it’s the Austin District. The application is TxDOT Form 1058. Inside some city limits, the city has taken over driveway permits on state roads, so ask first who handles your stretch.

County roads. The county handles these, and its rules can differ from TxDOT’s.

City streets. Inside city limits, the city’s own rules apply. If the land is also on a state road, you may be dealing with both.

A corner lot can touch two of these at once. That can be good news, since a side street sometimes gives you an entrance the highway won’t.

What TxDOT checks before it says yes

A few rules in TxDOT’s manual catch people off guard. Nobody can start work in the state’s strip of land along the road until they hold a fully signed permit and have given TxDOT 24 hours’ notice. The job isn’t finished when the concrete dries, either. A TxDOT inspector checks the work, and the driveway only counts as permitted once TxDOT accepts what was built.

The driveway has to fit inside your own frontage, curves included. And the roadside ditch belongs to the highway. You can’t block it or change how water flows through it. If your driveway needs a culvert, which is a pipe that carries the ditch water under the driveway, TxDOT approves its size.

That matters more here than in a lot of places. In the Hill Country west of I-35, deep ditches and steep road edges are common. On the Highway 46 tract, the ground rose more than 40 feet from the road to the back of the property. Terrain like that can change what an entrance costs and where it can go.

How far apart driveways have to be

On a regular state highway posted at 50 mph or more, TxDOT’s starting point is about 425 feet between driveways, measured edge to edge. At 45 mph it’s about 360 feet, and at 30 mph or less about 200 feet. Those numbers are for cars on flat ground. TxDOT can ask for more room on a downhill grade or where a lot of trucks use the road, and our area has plenty of both.

Frontage roads have their own numbers. On a two-way frontage road posted at 50 mph or more, the starting point is about 510 feet.

Out on quiet rural roads, the rules loosen a little. TxDOT’s spacing table doesn’t apply to rural highways outside the metro planning areas that carry fewer than about 2,000 vehicles a day and have little chance of development. There, TxDOT looks at each driveway on its own: traffic, speed, shoulders and the shape of the road. Some farm-to-market roads in Blanco and Gillespie counties may fall in that group. Ask before you assume.

If your land is narrow, or a neighbor’s driveway sits close to your line, there may not be room for a new one at all. TxDOT’s manual offers a few ways around that. You can share one driveway with the neighbor. You can put yours at the edge of your land farthest from the intersection. Or you can accept a driveway that only allows right turns in and right turns out. Each of those can work for one kind of business and sink another.

Diagram showing a proposed driveway too close to a neighbor's driveway and to a corner, and three options: share one driveway, use the far edge, or right in and right out only.

Freeways and frontage roads

Along I-35, Loop 1604 and the freeway sections of US 281 and I-10, you can’t put a driveway onto the freeway itself. Land along a freeway connects to the frontage road, the smaller road that runs beside it.

That changes how customers reach you. Many frontage roads run one way, so traffic arrives from one direction only. Drivers coming the other way have to exit, turn around at a U-turn lane or cross street, and come back. TxDOT also keeps driveways away from the spots where ramps meet the frontage road. A site right before an on-ramp or right after an off-ramp may have less room for an entrance than its frontage suggests.

Diagram of a freeway with one-way frontage roads. A driver on the far side passes the property, loops through the U-turn lane at the cross street and comes back. No driveways are allowed near the ramp.

None of that makes freeway land a bad buy. Thousands of drivers pass it every day. Before you buy, count how many of them can actually turn in.

Getting in and getting out

Traffic engineers call these ingress and egress. TxDOT looks hard at both, and you should too, because they decide whether customers and trucks can use your site the way your plan needs.

Left turns come first. On a divided road, the median, the raised or grassy strip down the middle, decides who can turn left. Getting a driveway approved and getting a gap in the median are two separate questions, so ask about both. Where a raised median is in place, TxDOT’s manual says a left-turn lane should be considered for any left turn into a property, however few cars make it.

Right turns in are next. A right-turn lane gives drivers room to slow down out of the through lanes before they turn in. TxDOT’s manual says one should be considered once about 50 cars an hour turn in from a road posted above 45 mph, or about 60 cars an hour on a road posted 45 mph or less. TxDOT can ask for one below those numbers where truck traffic is heavy, crashes are common or drivers can’t see far down the road.

Then right turns out. If more than about 200 cars an hour leave by turning right, TxDOT may look for an acceleration lane, a short extra lane that lets drivers get up to speed before they merge.

Diagram of a divided highway with a right-turn lane into a business, an acceleration lane out, and a left-turn lane in the median, with TxDOT's cars-per-hour guidelines.

The driveway itself has rules too. A commercial driveway’s width and curves depend on the traffic and the location. A driveway split into one lane in and one lane out needs a raised divider between them. And a driveway has to meet the road at close to a right angle, 75 to 90 degrees, except on one-way frontage roads and divided highways, where TxDOT allows an angled one-way driveway.

What you plan to build decides which of these rules apply to you. A contractor has a few pickups and trailers heading out in the morning and coming back at night. A busy store wants cars turning in all day from both directions, with fuel and delivery trucks mixed in. A busy store can pass the right-turn line most mornings. A contractor’s yard usually won’t.

Turn lanes can also work in your favor. The Highway 46 tract became easier to sell once its new turn lane let cars in and out from both directions.

Who pays, and when TxDOT wants a traffic study

Texas rules put the design of a driveway on the property owner, and TxDOT’s manual has the owner supply the materials for everything the permit covers. So if your permit calls for a turn lane, budget for it as your cost unless TxDOT tells you otherwise in writing. A turn lane needs engineering, and it can use up frontage you planned for parking, a sign or a building.

Most small driveways don’t need a traffic study. TxDOT’s manual says a driveway for a single home or a single shop, on a road with light traffic, that meets the spacing rules usually needs none. A moderate project that raises turn-lane questions may need an engineering study. That’s an estimate of how many cars your business will bring at its busiest times and which way they’ll turn. TxDOT uses it to decide whether you need a turn lane and how long it has to be. A full traffic impact analysis, which also looks at the nearby intersections, is rare. TxDOT saves it mostly for large projects, such as a big shopping center, and for driveways that can’t meet the spacing rules. Inside a city that has its own traffic study rules, you follow the city’s.

TxDOT’s advice is to meet with the district staff early, before you design anything. That meeting is where they tell you what study, if any, they’ll want. If you’re buying, the time for it is during due diligence, while you can still change the plan or walk away.

If the answer is no

A TxDOT denial for a specific location has to be in writing, give the reasons and carry the district engineer’s signature. That written answer is worth having. A buyer can plan around it, and a seller can decide what to do next.

You can also ask for a variance, which is an exception to one of the rules. TxDOT will consider one if following the rule would cost the land reasonable access or put an undue hardship on a business, or if an unusual condition the owner didn’t cause justifies it. The request has to come with design data, and TxDOT can still say no if the driveway would hurt safety or traffic on the highway.

Old gates and existing driveways

A lot of roadside land in the Hill Country still has its original ranch gate. Before you build a business plan around that gate, or any driveway already on the land, find out what kind of permit it has.

TxDOT permits some gates as field driveways, which are meant for farm equipment only. Texas rules go further than that. A new permit is required before a big change in how the land is used, how much traffic the driveway carries or what kind of vehicles use it, if that change would bring stricter standards. A gate that has served cattle trailers for decades may not carry over to a store. Remodeling or rebuilding a business on the same land usually doesn’t need a new permit, unless TxDOT finds in writing that the new traffic would be a safety threat.

TxDOT’s guidance for ranch driveways also says the gate has to sit far enough back from the road to hold the longest vehicle that uses it, and at least a pickup with a trailer. If your trucks pull long trailers, make sure the whole rig is off the road while someone opens the gate.

Diagram comparing a gate close to the road, where a pickup's trailer sticks into the highway, with a gate set back far enough for the whole rig to wait off the road.

The roads are changing

Our area is growing fast, and TxDOT is rebuilding roads to keep up. Widenings, new medians and freeway conversions can change a property’s access for better or worse.

Road work can hurt a property while it’s under way and help it once it’s done. That’s what happened on Highway 46. On US 281, TxDOT plans to turn about 6.7 miles between Borgfeld Drive and Highway 46 into a freeway with one-way side roads. If that’s built, driveways that open onto 281 today would likely open onto a side road instead. The public hearing for that plan is Tuesday, November 10, 2026, from 5 to 7 p.m. at Bulverde Methodist Church, 28300 US 281, and written comments are due November 25. Our guide to Highway 281 construction covers that and other projects on the road.

Whatever road your land is on, look up TxDOT’s plans for it before you buy or sell. A project still on paper today can decide what a buyer pays in five years.

If you’re buying

Start by writing down what your business needs from the road: how many entrances, which turns your customers have to make, and the biggest truck that will come in. Then drive to the property from both directions at the time of day your customers would. If you couldn’t turn left, notice where you’d have to go to turn around.

Ask the seller for the survey, the title commitment and any driveway permits or plans they have. If you need a new entrance or a wider one, bring in a civil engineer early and call the permitting office while you still have plenty of time left in due diligence, the time a buyer has to study a property before committing.

Order matters. If your business can’t run without a new driveway, settle that first. Don’t spend money on the rest of due diligence while the one question that could end the deal is still open. Your attorney can set the contract deadlines to match how long the driveway answer is likely to take. Our buyer representation work starts with that kind of list.

If you’re selling

Ask every buyer what they plan to do with the land and what that plan needs from the road. A buyer who will use the entrance you already have is a different offer from one who needs two new driveways, even at the same price. That holds for cash offers too. Cash takes the lender out of the deal. TxDOT is still in it.

When a buyer asks for more time, ask what happened since the last extension and what will happen during the next one. A filed application, an engineer’s drawing or a letter from TxDOT tells you something real. “We need a few more weeks” doesn’t.

Know what your entrances can do before you list. Find any driveway permits, and look at whether the land could be split along the entrances it already has, the way the Ammann Road family’s land was. And keep other buyers warm while you wait on a slow one, within what your contract allows. That’s a big part of how we handle seller representation.

Common questions

Does highway frontage mean I can put in a driveway?

Frontage gives you a place where a driveway could go. TxDOT, the county or the city decides whether you get one, where it sits and which turns it allows. Check before you pay for land that only works with a new entrance.

Who approves a driveway on a farm-to-market road?

TxDOT. Farm-to-market roads are state roads, so the same permit process applies. In Bexar, Comal, Guadalupe and Kendall counties that’s the San Antonio District, and in Hays, Blanco and Gillespie counties it’s the Austin District.

Can I use the driveway that’s already there for a new business?

Maybe. Find out what it was permitted for. Texas rules require a new permit before a big change in the land’s use, the driveway’s traffic or the vehicles using it, if the change would bring stricter standards. A gate permitted as a field driveway is for farm equipment only. Ask the seller for the permit, and if there isn’t one, ask the permitting office.

Who pays for a turn lane?

Plan on paying for it yourself. Texas rules put the driveway design on the owner, and the owner supplies the materials for the work the permit covers. Ask TxDOT early whether your plan will need one, because it changes both the budget and how much frontage you have left.

Will I need a traffic study?

Probably not for a small, low-traffic use on a road where you can meet the spacing rules. A busier business may need an engineering study that estimates its traffic and turns. A full traffic impact analysis is rare and mostly for large projects. TxDOT decides, so ask at an early meeting with the district staff.

Can I get a driveway onto I-35?

Not onto the main lanes. Land along I-35 connects to the frontage road, and TxDOT keeps driveways away from the ramps. Many frontage roads are one way, so check how customers coming from the other direction would reach you.

How long does a driveway permit take?

We can’t give you one number. It depends on the road, the site and whether the driveway needs engineering, a culvert or a turn lane. Start early and ask the permitting office what they need from you.

Can a cash buyer still need months of due diligence?

Yes. Cash means the buyer doesn’t need a loan. Driveways, surveys, easements and engineering still take time. On our US 281 sale, a cash buyer kept asking for more time from October to April.

Should I turn down a buyer who needs a new driveway?

Not for that alone. Ask how they plan to get the approval, who is doing the engineering and what happens if the answer is no. Then compare the offer with your other choices, including any backup buyer.

Terms used

  • Frontage: The stretch of road along the front of your land.
  • Right of way: The strip of land the state owns along the road, including the shoulder and the ditch.
  • Driveway permit: Written approval to build or change a driveway onto a road.
  • Frontage road: A smaller road beside a freeway that land connects to instead of the freeway itself.
  • Farm-to-market road: A state road, often rural, marked FM. TxDOT handles its driveway permits.
  • Field driveway: A gate TxDOT allows for farm equipment only.
  • Culvert: A pipe under a driveway that carries the ditch water.
  • Median: The raised or grassy strip between the two directions of a road.
  • Ingress and egress: Getting into a property and getting out of it.
  • Turn lane: An extra lane where drivers slow down or wait to turn in, out of the way of through traffic. Also called a deceleration lane.
  • Acceleration lane: A short extra lane that lets drivers leaving a property get up to speed before they merge.
  • Engineering study: An estimate of the traffic a new business will bring and which way it will turn, used to decide on turn lanes.
  • Traffic impact analysis: A bigger study that also looks at nearby intersections, usually for large projects.
  • Variance: An exception to one of TxDOT’s access rules, granted for hardship or an unusual condition.
  • Easement: A right someone else holds to use part of your land.
  • Title commitment: The title company’s report of what is recorded against a property before closing.
  • Due diligence: The time a buyer has to study a property before committing to buy it.
  • Backup offer: A signed offer that moves into first place if the current contract ends.

If you own land on a highway anywhere from San Antonio to the Hill Country, or you’re looking at a roadside site for your business, talk to Rex before the driveway turns into the problem.

Sources

This article is general information as of October 25, 2026. TxDOT rules and road plans change. For a specific property, check with the permitting office and have an engineer and a real estate attorney look at your plans and your contract.

Worth reading

What is changing in Texas land, water and growth, explained for owners, not insiders.

All articles
Rex Blackburn

Talk to Rex before you decide anything

A 15-minute call. Tell him what you own or what you want to buy. He will tell you what he sees, good and bad. No cost, no pressure.

Talk to Rex

or call 210-823-3721

We Are Ready To Help You In Making Smart Real Estate Decisions

We Would Love To Hear From You. Just Fill Out This Form And We Will Get Back to You Shortly

Whether you have questions about commercial real estate, need advice on your next investment, or are ready to take the next step, we’re here to help. At Blue Collar Commercial Group of New Braunfels, we pride ourselves on providing personalized, expert guidance at every step. Fill out the contact form, and we’ll get back to you promptly to discuss how we can work together to achieve your goals. Let’s start the conversation today!

Direct
210-823-3721
Email
[email protected]
Contact

Join Our Newsletter

Local commercial real estate news and new listings, once a month.

Newsletter